Project Database

Tips, tricks and stories about maintaining the Alberg 37

Member Input Welcome!

Send your input to:a37ioanospam@sylvaninfo.net (remove "nospam)

 

(Page last modified: 04/06/08)

Galley

Ziploc Omelet

        Carol Anne's Ship Bread (10/25/07)

Cindy's Almost Pumpkin Pie (1/13/08)

 
Engine

Stuffing Box

        Shaftlog Drawing

Cutless

Volvo MD-IID

Volvo MD-IIB

Volvo MD-IIC

Albin Parts

Yanmar 3GM30F Exhaust System

        Original A-37 Exhaust System Drawing

 

Canvas Work
Cockpit Cover (Gendell)

 

Sails and Rigging

Sails

Spars (Mast Collar-Gendell)

 

Sail Plan Modification

 

Standing Rigging (Rigging Diameters and Lengths)

 
        Standing Rigging Setup and Through Hull Diagram

Running Rigging

 
Deck and Hull

Seacocks

Worn Steering Cable Sheave Pins 

Comparison between the MK-I and MK-II Layouts

Shaftlog-Stuffing Box

Rudder Removal and Replace

Prop Zinc Solution (One Solution)

        Prop Zinc Solution (Another Solution)

Aluminum Portlight Gasket Fix

Cutless Bearing/Shaft Log Replacement Discussion

MK-II FORWARD HATCH FRAME REPLACEMENT

STERN PULPIT REFIT

Rudder Mold Acquired

        Repacking The Alberg 37 Rudder Stuffing Box
        Rudder Pin/Shoe Fix (ELIXIR-Joran Gendell)

 

Ground Tackle

       Anchor Chain Dimension Chart

            "BBB" Chain Specifications

            Proof Coil Chain Specifications

            'G4' High Test Chain Specifications

        

       Bow Rollers

Exterior
   
Cockpit Table For Spirit (1-2008)

 

 
Interior

Main Salon Table For SPIRIT (1-2008)

Head

Galley

Nav Station

Fresh Water

        Provisioning Diagram

Water Heater Access (Gendell)

 
Electronics/Electrical

Nav Instruments

AC Wiring

DC Wiring

Original DC Wiring Diagram
SSB Radio Installation (12/05)
Below Deck Auto-Pilot (10/07)

 

 
Fuel System

Fuel Tank Cleaning Procedure

 
      Tank Gauging Project on ELIXIR
 

Commissioning

Commissioning Thoughts

Warm Climate Storage checklist

General Refits & Repairs (by Boat),

SOLSKIN II (1997)

BRIGHTLINGSEA II (1997)

TEELOK

TEVAKE Receives a Refit/Refurbish/Rebuild (Kip and Linda Newbould) 2007

 

Looking for something in particular? Search the site!

Hit Counter Visits Since 1/21/08